QUALITY MANAGEMENT

  • 01 Material Inspection

  • 02 Separated Rack for Accepted
    and Rejected Material

  • 03Pre-production Sample
    Approval

  • 04 Cutting with automatic
    cutting machine

  • 05Sewing 100% garment
    inspection

  • 06Finishing 100% garment
    passed to Metal Detector

  • 07Packing 100% Carton
    Inspection to verify contents

  • 08 Final Inspetion AQL 4.0
    Normal Level 2